Kitchen Remodels

Layouts, cabinets, counters, lighting — typical kitchen remodel timelines 5–12 weeks.

Kitchen remodels are our most requested residential project. We handle layout changes, cabinetry, countertops, backsplashes, lighting, flooring transitions, and coordination with plumbers and electricians.

What’s typically included

  • Design consult and measured drawings
  • Demo of existing finishes (with dust control)
  • Cabinet install or refacing options
  • Quartz, granite, or butcher-block counters
  • Tile or slab backsplash
  • Updated lighting and under-cabinet LEDs
  • Appliance rough-ins for common sizes

Typical timeline

A standard galley or L-shaped kitchen without structural moves often runs 5–7 weeks on site after materials arrive. Full gut kitchens with wall changes or window moves usually run 8–12 weeks.

Lead time note: Custom cabinets often take 4–8 weeks to manufacture before install starts. We schedule carpentry around that window so your home is not open longer than needed.

Popular upgrades

  • Pantry built-ins and appliance garages
  • Island seating for 3–4
  • Soft-close hardware throughout
  • Pot filler or prep sink (where plumbing allows)

Ready to talk scope? Visit our Contact & Service Area page to request a free estimate.