Bathrooms

Full and half baths, tile showers, accessibility updates — typical timelines 1–5 weeks.

We remodel primary baths, hall baths, and powder rooms. Work ranges from cosmetic refreshes to full gut renovations with new waterproofing, tile showers, and accessibility improvements.

Full bathroom remodel

  • Tub-to-shower conversions
  • Curbless or low-threshold showers where structure allows
  • Vanity, mirror, and lighting packages
  • Heated floor options in select rooms
  • Exhaust fan upgrades for moisture control

Half baths / powder rooms

Smaller spaces move faster. A typical powder-room refresh (vanity, fixtures, flooring, paint) often finishes in 1–2 weeks. Full baths with tile showers usually take 3–5 weeks on site.

Accessibility: We regularly add grab bars, comfort-height toilets, and wider clearances for aging-in-place updates. Mention mobility needs during the estimate visit.

What we need from you

  1. Photos of the existing bath and any water issues
  2. Must-have fixtures (tub vs shower, double vanity, etc.)
  3. Whether the home will be occupied during work

Questions about bathrooms? Ask the site assistant or request an estimate.